SIDPGROUPStrategic Infrastructure Development Partners
Energy Optimization

Develop the site for lower energy costs.

Combine AI-driven controls, on-site power and storage, and utility-rate strategy. The right mix can materially reduce energy costs while protecting critical operations.

Discuss an energy project

Three ways to lower the same energy bill

We model these together against the facility’s load profile and utility tariff. One decision, such as when to charge a battery, can affect both energy charges and peak-demand charges.

Use less energy with AI

An AI operations platform combines interval meter readings, equipment telemetry, weather and operating schedules to forecast demand and flag waste. It can recommend or carry out approved changes to cooling, refrigeration and other flexible loads within limits set by the operator.

Generate and store energy on site

Solar can offset daytime grid purchases. A battery energy storage system (BESS) can store excess solar or lower-cost grid power for later use. We also evaluate thermal storage and alternatives such as fuel cells where the load, site and economics support them.

Buy power when it costs less

Where the tariff allows, rate arbitrage means charging the battery or shifting flexible loads to lower-priced hours, then drawing on stored energy when rates rise. Dispatch can also reduce billed peak demand. We model both benefits together, allowing for tariff rules, battery losses and wear.

What the combined system does

At a cold-chain facility, the AI platform can forecast a late-afternoon demand spike. Solar serves part of the daytime load, approved cooling tasks can run earlier, and the battery supplies part of the remaining peak. That can cut expensive grid purchases and reduce the demand charge while maintaining required temperatures.

We compare the total bill against a baseline adjusted for weather and operations, then account for installation, operating and financing costs. The results show where the savings come from and whether they support investment.

Illustrative refrigerated supermarket aisle

Why this is site development

Installing on-site energy assets changes the facility’s electrical infrastructure, operating controls and, in some cases, its utility connection. SIDP develops the project from the first bill review through the approvals, engineering and financing needed to build it.

Establish the baseline

Review bills, interval data, existing controls and the loads that must stay within strict operating limits.

Design for the property

Size the equipment, check space and electrical capacity, and define how controls integrate with facility systems.

Secure approvals and capital

Confirm site rights, permitting and utility interconnection requirements as applicable. Document costs, expected savings, financing and delivery responsibilities.

Commission and verify

Test dispatch and safeguards, measure savings against the baseline, and use the results to decide whether to expand across a portfolio.

Start with one facility.

We work with data centers, hospitals and medical facilities, grocery and cold-chain operators, and other energy-intensive sites. A first review starts with the location, utility bills and available interval data.

Discuss an energy project